Transportation of High-Speed Train Carriages from Khorgos to Tashkent
A convoy of trucks transports high-speed train cars covered with protective covers along the highway, accompanied by specialized escort vehicles.

About the project

Organisation and execution of the transportation of a 7-car high-speed train set from China to Uzbekistan. The route crossed three countries: China, Kazakhstan, and Uzbekistan. Loading: September 1–2, 2026, Khorgos.

Key Project Parameters

Route: Khorgos (China) → Tashkent Tovarniy (Uzbekistan)
Number of units: 7 carriages
Total weight: 359.4 tonnes
Transit time: 5–6 working days from Khorgos

Cargo specifications

Type: High-speed train (HST) carriages

The 7-carriages consist forms a complete train set: two leading power carriages (TC), four intermediate motor carriages (M, M'), and one trailing carriages (T). Each carriages is a structurally independent unit with individual weight and dimensional characteristics.

Width and height are identical across all carriages: 3.15 × 4.35 m. Length varies by type — TC leading carriages are 2.15 m longer than intermediate carriages, requiring different trailer configurations.

A convoy of trucks carrying oversized cargo covered with protective tarpaulins on a highway.
CarriageTypeWeightLength
TC 1Leading power carriage51 610 kg26,45 m
TC 2Leading power carriage51 675 kg26,45 m
M’1Intermediate motor carriage55 630 kg24,30 m
M’2Intermediate motor carriage55 690 kg24,30 m
M 1Intermediate motor carriage49 970 kg24,30 m
M 2Intermediate motor carriage50 750 kg24,30 m
TTrailing carriage44 100 kg24,30 m

Total weight of all 7 units: 359,445 kg. The heaviest carriages are M'1 and M'2; the longest are TC 1 and TC 2. The cargo falls into the technically complex oversized category: high-precision railway equipment requires strict compliance with the lashing scheme and restrictions on tilt angle and dynamic loads in transit.

Logistics solution

Seven specialised vehicle combinations were deployed — prime movers rated at a minimum 650 HP paired with modular trailers of 8 to 10 axles each. Loading platform length: 25 m for 5 trailers; 27 m for 2 trailers carrying TC cars. Platform width: minimum 3 m.

Loading was carried out at the Khorgos warehouse using an individual lashing scheme for each carriage, with load calculations per axle. All 7 vehicle combinations moved in a coordinated convoy accompanied by civilian escort vehicles throughout the Kazakhstan leg of the route. Lashing and unlashing was performed at both ends of the route.

Documentation

A separate document set was prepared for each vehicle: CMR, special road permits for China and Kazakhstan, loading scheme showing axle loads, and transit customs declaration. Customs transit was processed at both border crossings. Throughout the route the client received a daily position report on each vehicle.

Result

  • All 7 carriages delivered to Tashkent Tovarniy on schedule
  • 359 tonnes of cargo cleared customs transit through Kazakhstan without delays
  • Cargo integrity confirmed on acceptance for each unit

Leave a request for a detailed consultation

We will prepare a full package of customs documents and ensure that control is passed without delays.
Discuss the Paperwork
Other projects
Тяжеловесная перевозка силового трансформатора 140 т на Алматинскую ТЭЦ-3
Тяжеловесная перевозка силового трансформатора 140 т на Алматинскую ТЭЦ-3
Transportation and foundation installation of a power transformer as part of the Almaty CHP-3 reconstruction project.
Project logistics for the supply of equipment for metallurgical production in Khorgos-Volzhsky (Project "RNK")
Project logistics for the supply of equipment for metallurgical production in Khorgos-Volzhsky (Project "RNK")
Organizing regular deliveries of equipment and materials from China to Russia for the construction of a modern production complex for the Russian Stainless Steel Company (RSC) in Volzhsky, Volgograd Region. NG-NEGABARIT acted as general freight forwarder for the project, ensuring an uninterrupted supply chain for large industrial equipment along the entire route.
Zoomlion 173 units of special equipment — China, Russia, Belarus
Zoomlion 173 units of special equipment — China, Russia, Belarus
173 units of heavy machinery. Two destinations: Russia and Belarus. A single continuous flow across the Eurasian Economic Union. When Zoomlion chose a partner for this operation, the task was clear but demanding: move an entire fleet out of the Khorgos plant and deliver every unit to its destination on time.
International transportation of industrial equipment from Khorgos to Nizhnekamsk
International transportation of industrial equipment from Khorgos to Nizhnekamsk
Planning and execution of a complex logistics operation for the large-scale delivery of process equipment from China to Russia for petrochemical production.
Anshan → St. Petersburg: Transportation of Oversized Equipment
Anshan → St. Petersburg: Transportation of Oversized Equipment
International heavy cargo shipment from Liaoning Province, China, to a manufacturing facility in Saint Petersburg. The route covered over 8,700 km across three countries and required comprehensive logistics planning at every stage.
International transportation of super-heavy chemical equipment from Weihai to Veliky Novgorod
International transportation of super-heavy chemical equipment from Weihai to Veliky Novgorod
Organization and execution of an international shipment of super-heavy, oversized chemical equipment from China to Russia. The cargo—medium-temperature carbon monoxide converters—was delivered to a major chemical production complex in Veliky Novgorod.
Show more
This site is protected by reCAPTCHA and the Privacy Policy and Terms of Service apply Google.