About the project
Organizing regular deliveries of equipment and materials from China to Russia for the construction of a modern production complex for the Russian Stainless Steel Company (RSC) in Volzhsky, Volgograd Region. NG-NEGABARIT acted as general freight forwarder for the project, ensuring an uninterrupted supply chain for large industrial equipment along the entire route.
Key Project Parameters
- Route: Khorgos (China) → Volzhsky (Russia)
- Distance: 3,700 km
- Delivery type: recurring project deliveries
- Cargo purpose: equipment for a cold rolling mill for stainless steel production
Project Complexity
The project nature of the deliveries required a systematic logistics framework: every shipment had to arrive in strict accordance with the facility construction schedule. The large dimensions of the equipment required special permits in Kazakhstan and Russia for each trip. The route passed through winter conditions, imposing additional requirements for cargo securing and transport planning.
Results
- Uninterrupted project deliveries of oversized equipment over a 3,700 km route
- Construction schedule maintained for the client's production complex
- Full customs support along the entire route
- Safety of high-technology metallurgical equipment ensured under winter conditions
- NG-NEGABARIT's competence in project logistics for large industrial facilities confirmed
Leave a request for a detailed consultation