Transportation and foundation installation of a power transformer as part of the Almaty CHP-3 reconstruction project. Route — within the city of Almaty. Delivery date: September 26, 2026.
Cargo specifications
Three-phase double-winding oil-immersed block power transformer 11BAT10, type SFP-2500000/110. Transport weight — 140 tonnes, dimensions: length — 6.5 m, width — 2.85 m, height — 3.75 m. The cargo falls into the heavy oversized category with strict requirements for rigging configuration and axle load distribution.
How we did it
Urban transport of a heavy transformer is a challenge in its own right: dense city infrastructure, road load limits, routing coordination with municipal authorities. The route was planned in advance — road surface bearing capacity, height restrictions, and vehicle clearance all verified before departure. The transformer was moved on a specialized trailer with no intermediate reloading, delivered directly from the origin point to the foundation on the CHP-3 site.

Result
The transformer was installed on the foundation on schedule. No damage to the equipment, ancillary components, or fastenings was found on inspection. No claims regarding cargo condition or delivery timelines.
Leave a request for a detailed consultation