About the project
Planning and execution of a complex logistics operation for the large-scale delivery of process equipment from China to Russia for petrochemical production.
Key Project Parameters
- Route: Khorgos (China) → Nizhnekamsk (Russia)
- Distance: 3,420 km
- Border crossings: Alashankou, Khorgos
- Execution period: December 2025 – February 2026
- Number of equipment units: 30+ oversized units
- Total cargo weight: over 850 tonnes
Cargo characteristics
Equipment types:
- Pressure vessels (buffer tanks, relief vessels, storage tanks)
- Instrument air receivers (IAR) up to 49.5 tonnes each
- Cooling equipment up to 75.5 tonnes (chillers, evaporator/condenser bases)
- Drain drums
- Auxiliary equipment (HTF systems, closed drain systems)
Overall dimensions:
- Max length: up to 26.78 m
- Max width: up to 5.35 m
- Max height: up to 4.64 m
- Max unit weight: 75.5 tonnes
Logistics solution
Specialized tractor units with low-bed trailers in various configurations:
- 3+3 TIEFBET - for medium sizes
- 3+4 TIEFF/SEMI – for heavy loads
- 3+5 TIEFF – for extra-heavy equipment
- 3+7 SEMI – for the heaviest loads (up to 49.5 t)
- 3+8 — for maximum-weight cooling units
Transportation organization: 26 specialized convoys in various configurations. Tractors: Volvo, MAN, Scania, Sitrak. Low-bed trailers: Goldhofer, Kaessbohrer, Faymonville, Benyuda.
Execution Details
Customs clearance: a complete supplementary documentation package for each unit, coordinated with customs authorities in both countries.
Technical documentation: individual transport drawings, unique unit identification (TAG No./IDENT) for each piece.
Results
- Seamless logistics for 26 oversized convoys
- Delivery priorities and technological sequence maintained
- Full customs support for all cargo units
- Safety of high-technology industrial equipment ensured
The project demonstrated expertise in organizing international transportation of oversized cargo, coordinating complex logistics involving multiple suppliers, working with high-tech industrial equipment, customs clearance of large industrial projects, operational planning, and managing transport flows.
The project was completed for the petrochemical sector and involved equipment delivery for a polymer processing production complex.