About the project
Organization and execution of international transport for heavy, oversized ring components of a PB/OSB production line from China to Russia. The cargo was delivered to a wood-processing complex in Kemerovo.
Key Project Parameters
Route: Shanghai (China) → Kemerovo (Russia)
Distance: 6,650 km
Timeline: May – July 2026
Cargo Volume: 2 oversized units
Total Gross Weight: 84.8 tons
Logistics solution
Transport Fleet: Heavy-duty prime mover paired with a 3-section modular semi-trailer. This configuration provided the necessary load-bearing capacity and weight distribution for long-distance haulage of non-standard ring components.
Loading Execution: Loading in Shanghai was performed using two mobile cranes with a combined lifting capacity exceeding 100 tons. Each trunnion was loaded into its transport position on a custom-engineered 11-ton steel frame, which was essential for securing ring structures of this diameter.

Cargo characteristics
Equipment Type: Trunnion assemblies — ring components for SWPM CONTIPLUS continuous presses used in PB/LSB/OSB board manufacturing.
Dimensions (Per Unit in Transport Position):
- Length: 8.2 m
- Width: 7.5–7.6 m
- Height: 5.3 m
- Gross Weight (with frame): 42.4 tons
Route & Distance
The total transit distance was 6,650 km. From Shanghai, the heavy convoy proceeded to the Khorgos border crossing, traversed Kazakhstan, and entered Russia. Final destination: Temporary Storage Warehouse (TSW) in Kemerovo, where the cargo was placed pending customs clearance by the consignee.
Execution Details
The total transit distance was 6,650 km. From Shanghai, the heavy convoy proceeded to the Khorgos border crossing, traversed Kazakhstan, and entered Russia. Final destination: Temporary Storage Warehouse (TSW) in Kemerovo, where the cargo was placed pending customs clearance by the consignee.
Results
- Both ring components delivered safely with zero damage
- Smooth, uninterrupted border crossings
- End-to-end customs support along the entire route
- Complete safety and integrity guaranteed for high-tech industrial equipment
This project further demonstrates our capabilities in executing complex transport solutions for non-standard circular and heavy-lift machinery.

Leave a request for a detailed consultation