Zoomlion: 173 Units of Heavy Equipment — China, Russia, Belarus 
Zoomlion 173 units of special equipment — China, Russia, Belarus

About the project

73 units of heavy machinery. Two destinations: Russia and Belarus. A single continuous flow across the Eurasian Economic Union. When Zoomlion chose a partner for this operation, the task was clear but demanding: move an entire fleet out of the Khorgos plant and deliver every unit to its destination on time.

Key Project Parameters

Route: Khorgos (China) – Russia, Belarus, length over 5,300 km.
Border crossings: Khorgos (PRC / Kazakhstan), then transit through Kazakhstan to the EAEU countries.
Volume: 173 units of heavy construction and mining equipment.
Transport: 173 convoys — low-bed trailers and flatbed carriers depending on cargo type

Cargo characteristics

Zoomlion construction and mining excavators across multiple categories — 14 to 35 tonnes — plus mining dump trucks up to 35 tonnes.

The cargo was mixed. Some units fell within standard dimensions. Others — over 3.5 m tall and 3.2 m wide — required special transport procedures, permits, and low-bed trailers. That heterogeneity defined the entire logic of the project.

It was precisely this heterogeneity that determined the entire logic of the project.

Execution Details

Equipment selection: low-bed trailers were used for oversized units, keeping the total height down and allowing unobstructed passage under bridges and overpasses. Larger machinery was transported on flatbeds. Each unit required its own individual solution.

Uninterrupted flow: 173 convoys had to cross border checkpoints continuously, without piling up. We structured the delivery schedule so cargo moved in a steady stream — from receipt at Khorgos all the way to delivery at facilities in Russia and Belarus.

Customs clearance: we handled full export documentation for all units leaving China and organized transit through Kazakhstan in compliance with EAEU regulations.

Special permits: all necessary permits for oversized cargo were obtained along the route.

Results

All 173 Zoomlion units were delivered to their destinations in Russia and Belarus. No losses, no significant transit delays, no missed deadlines.

  • A fleet of 173 units mobilized and dispatched within a single operation
  • Steady flow maintained across multiple international borders
  • Full customs coverage for the entire route
  • Each unit transported on the trailer type matched to its specific dimensions

Zoomlion wasn't one shipment. It was 173 individual solutions packed into one continuous operation. This project proved that scale isn't a constraint — it's just a different level of planning.

Leave a request for a detailed consultation

We will prepare a full package of customs documents and ensure that control is passed without delays.
Discuss the Paperwork
Other projects
International transportation of large-sized heat exchange equipment Khorgos - Talimarjan
International transportation of large-sized heat exchange equipment Khorgos - Talimarjan
Planning and execution of international transport of large-scale industrial equipment — a condenser — from China to Uzbekistan. The cargo was delivered to an energy infrastructure facility in Talimarjan, Kashkadarya Region, Republic of Uzbekistan.
Project logistics for the supply of equipment for metallurgical production in Khorgos-Volzhsky (Project "RNK")
Project logistics for the supply of equipment for metallurgical production in Khorgos-Volzhsky (Project "RNK")
Organizing regular deliveries of equipment and materials from China to Russia for the construction of a modern production complex for the Russian Stainless Steel Company (RSC) in Volzhsky, Volgograd Region. NG-NEGABARIT acted as general freight forwarder for the project, ensuring an uninterrupted supply chain for large industrial equipment along the entire route.
International transportation of industrial equipment from Khorgos to Nizhnekamsk
International transportation of industrial equipment from Khorgos to Nizhnekamsk
Planning and execution of a complex logistics operation for the large-scale delivery of process equipment from China to Russia for petrochemical production.
Anshan → St. Petersburg: Transportation of Oversized Equipment
Anshan → St. Petersburg: Transportation of Oversized Equipment
International heavy cargo shipment from Liaoning Province, China, to a manufacturing facility in Saint Petersburg. The route covered over 8,700 km across three countries and required comprehensive logistics planning at every stage.
International transportation of super-heavy chemical equipment from Weihai to Veliky Novgorod
International transportation of super-heavy chemical equipment from Weihai to Veliky Novgorod
Organization and execution of an international shipment of super-heavy, oversized chemical equipment from China to Russia. The cargo—medium-temperature carbon monoxide converters—was delivered to a major chemical production complex in Veliky Novgorod.
Show more