International transportation of industrial equipment from Khorgos to Nizhnekamsk
Large white truck transporting oversized petrochemical industry equipment covered with a green mesh.

About the project 

Planning and execution of a complex logistics operation for the large-scale delivery of process equipment from China to Russia for petrochemical production.

Key Project Parameters

  • Route: Khorgos (China) → Nizhnekamsk (Russia)
  • Distance: 3,420 km
  • Border crossings: Alashankou, Khorgos
  • Execution period: December 2025 – February 2026
  • Number of equipment units: 30+ oversized units
  • Total cargo weight: over 850 tonnes

Cargo characteristics

Equipment types:

  • Pressure vessels (buffer tanks, relief vessels, storage tanks)
  • Instrument air receivers (IAR) up to 49.5 tonnes each
  • Cooling equipment up to 75.5 tonnes (chillers, evaporator/condenser bases)
  • Drain drums
  • Auxiliary equipment (HTF systems, closed drain systems)

Overall dimensions:

  • Max length: up to 26.78 m
  • Max width: up to 5.35 m
  • Max height: up to 4.64 m
  • Max unit weight: 75.5 tonnes

Logistics solution

Specialized tractor units with low-bed trailers in various configurations:

  • 3+3 TIEFBET - for medium sizes
  • 3+4 TIEFF/SEMI – for heavy loads
  • 3+5 TIEFF – for extra-heavy equipment
  • 3+7 SEMI – for the heaviest loads (up to 49.5 t)
  • 3+8 — for maximum-weight cooling units

Transportation organization: 26 specialized convoys in various configurations. Tractors: Volvo, MAN, Scania, Sitrak. Low-bed trailers: Goldhofer, Kaessbohrer, Faymonville, Benyuda.

Execution Details

Customs clearance: a complete supplementary documentation package for each unit, coordinated with customs authorities in both countries.

Technical documentation: individual transport drawings, unique unit identification (TAG No./IDENT) for each piece.

Results

  • Seamless logistics for 26 oversized convoys
  • Delivery priorities and technological sequence maintained
  • Full customs support for all cargo units
  • Safety of high-technology industrial equipment ensured

The project demonstrated expertise in organizing international transportation of oversized cargo, coordinating complex logistics involving multiple suppliers, working with high-tech industrial equipment, customs clearance of large industrial projects, operational planning, and managing transport flows.

The project was completed for the petrochemical sector and involved equipment delivery for a polymer processing production complex.

Leave a request for a detailed consultation

We will prepare a full package of customs documents and ensure that control is passed without delays.
Discuss the Paperwork
Other projects
International transportation of large-sized heat exchange equipment Khorgos - Talimarjan
International transportation of large-sized heat exchange equipment Khorgos - Talimarjan
Planning and execution of international transport of large-scale industrial equipment — a condenser — from China to Uzbekistan. The cargo was delivered to an energy infrastructure facility in Talimarjan, Kashkadarya Region, Republic of Uzbekistan.
Project logistics for the supply of equipment for metallurgical production in Khorgos-Volzhsky (Project "RNK")
Project logistics for the supply of equipment for metallurgical production in Khorgos-Volzhsky (Project "RNK")
Organizing regular deliveries of equipment and materials from China to Russia for the construction of a modern production complex for the Russian Stainless Steel Company (RSC) in Volzhsky, Volgograd Region. NG-NEGABARIT acted as general freight forwarder for the project, ensuring an uninterrupted supply chain for large industrial equipment along the entire route.
Zoomlion 173 units of special equipment — China, Russia, Belarus
Zoomlion 173 units of special equipment — China, Russia, Belarus
173 units of heavy machinery. Two destinations: Russia and Belarus. A single continuous flow across the Eurasian Economic Union. When Zoomlion chose a partner for this operation, the task was clear but demanding: move an entire fleet out of the Khorgos plant and deliver every unit to its destination on time.
Anshan → St. Petersburg: Transportation of Oversized Equipment
Anshan → St. Petersburg: Transportation of Oversized Equipment
International heavy cargo shipment from Liaoning Province, China, to a manufacturing facility in Saint Petersburg. The route covered over 8,700 km across three countries and required comprehensive logistics planning at every stage.
International transportation of super-heavy chemical equipment from Weihai to Veliky Novgorod
International transportation of super-heavy chemical equipment from Weihai to Veliky Novgorod
Organization and execution of an international shipment of super-heavy, oversized chemical equipment from China to Russia. The cargo—medium-temperature carbon monoxide converters—was delivered to a major chemical production complex in Veliky Novgorod.
Международная перевозка крупногабаритных компонентов пресса Шанхай — Кемерово
Международная перевозка крупногабаритных компонентов пресса Шанхай — Кемерово
Show more
Этот сайт защищен reCAPTCHA, применяются Политика конфиденциальности и Условия использования Google.